MRSB - Job Progress

I have seen a green progress bar on the MRSB as time is booked to a time & quantity based operation in a previous version (currently on 10.1.600.15), since the upgrade I can no longer get this working. The Job Scheduling board does show the green line but the operation shrinks on the MRSB based on the time left - anyone know if this is a setting/toggle?