My company wants me to add a pack operation after the last operation of Final Inspection.
When I DMT the operation, it is duplicating the resource - so the operation has 2 resources.
I have checked the resource group and operation and there is only one resource assigned.
Has anyone have this experience?
If you manually add a Operation does it doe the same thing? I hope you are using a test environment to test this.
Cathy
(Cathy Bennett)
3
Yes - I am doing this in test. When I manually add the Pack operation, it creates one resource.
Kimberley
(K White)
4
what columns are you using in your DMT? What DMT (process) menu are you selecting for the update? (sorry don’t know correct terminology on that one)
This is what I have used in past.
Gil_V
(Gil Violette)
5
Can you just add the operation directly via the method - rather than using the import tool? Or, edit the job?
tmat
(Tracy Smith)
6
How many parts do you have to update?
May also be worth checking the OprSeq to ensure you’re not duplicating the last Operation that already exists.
Cathy
(Cathy Bennett)
7
There are 500 BOM’s and about 200 jobs.
I unchecked the Update button in the DMT - so it would have bounced back that the operation already existed.
I took the last operation and added 10 for the new sequence.
I started my test with only 1 record.
tmat
(Tracy Smith)
8
Can you show your sample upload information?
Cathy
(Cathy Bennett)
9
Found the problem. The Operation was setup with a resource group and a resource. Thank you for all the help.